View productEvery people-movement brief begins with one question: does the route rise between building levels, or does it run across distance on a single level? Teams comparing commercial escalator manufacturers with moving walk manufacturers are really choosing between a vertical route and a long-span horizontal one — and that answer fixes step width, inclination, rated speed and carrying capacity long before the first layout drawing is issued.

Before any width, angle or speed is discussed, confirm which job the equipment is doing. An escalator resolves level changes; a moving walk resolves distance. Getting this wrong is the single most expensive mistake in a people-movement specification.
| Decision input | Escalator route | Moving walk route | Buyer action |
|---|---|---|---|
| Route geometry | Floor-to-floor level change | Horizontal run or 10°, 11°, 12° incline | Map the passenger path on a section drawing first |
| Distance profile | Short, repeated vertical hops | Long single-span connection up to 100 m travel | Measure the actual walking distance, not the straight-line distance |
| User mix | Walking pedestrians, hand-carried loads | Wheelchairs, strollers, trolleys, luggage carts, baby carriages | Confirm accessibility requirements before sizing width |
| Peak flow character | Bursts at level changes | Continuous pedestrian streams | Model peak hour, not average daily flow |
Once the route is settled, the configuration is a short list of numbers. These are the published figures for the WELLS moving walk — use them as the backbone of your technical submittal.


| Specification | Published value | Why it matters to your brief |
|---|---|---|
| Step width | 800 / 1000 mm | Sets single-lane versus dual-lane throughput and cart/stroller clearance |
| Inclination | 10° / 11° / 12° | Determines whether the unit is a level connection or a shallow riser |
| Rated speed | 0.5 m/s | Fixed speed — sizing is done with width and flow, not speed adjustment |
| Carrying capacity | 4800 / 6000 persons/hour | The headline throughput figure your traffic model must clear |
| Lifting height | 1.0–12.0 m (narrative range) | Confirm the rise your building actually needs — see the reconciliation note below |
| Radii of curvature of the upper stair | 3500 mm | Reserve the correct end-of-run envelope in your layout |
| Power supply | Three-phase AC 380V / 50Hz | Movement power — confirm at the electrical load schedule stage |
| Lighting power | Single-phase AC 220V / 50Hz | Separate lighting circuit for the unit |
| Installation place | Indoor / semi-outdoor / outdoor | Drives finishes, drainage and environmental detailing |
| Running time | 24 hours per day | Continuous duty — plan maintenance windows accordingly |
Both the 800 mm and the 1000 mm step widths are published with 0°, 10°, 11° and 12° rising angles, a maximum travel length of 100 m, a maximum rising height of 8 m and a rated speed of 0.5 m/s. If your connection exceeds 8 m of rise or 100 m of travel, split it into multiple units rather than pushing one machine beyond the published envelope.
| Width of step | Rising angle | Max. travel length | Max. rising height | Rated speed |
|---|---|---|---|---|
| 800 mm | 0° / 10° / 11° / 12° | 100 m | 8 m | 0.5 m/s |
| 1000 mm | 0° / 10° / 11° / 12° | 100 m | 8 m | 0.5 m/s |
Two projects with identical passenger flows can end up with different units because of environment, structure and services. Collect these inputs before you open a supplier conversation.

All three installation places are published options. Outdoor and semi-outdoor units need weather detailing agreed with the supplier at enquiry stage.
Three-phase AC 380V/50Hz drives the movement; single-phase AC 220V/50Hz serves lighting. Route both to the unit location.
The upper stair curvature radius is 3500 mm. Confirm this clearance against ceilings, soffits and adjacent finishes.
The unit supports continuous 24-hour running, which is designed to minimise downtime and stretch maintenance intervals.
Indoor, semi-outdoor or outdoor — write it into the enquiry so the supplier can confirm finishes and sealing.
The unit uses modular construction intended to simplify installation and maintenance. Agree the structural supports, pit/landing interfaces and truss anchorage with the supplier before the slab is poured.
Both the three-phase movement supply and the single-phase lighting supply must appear on the electrical schedule.
For 24-hour units, agree inspection access and the pallet/panel removal path at design stage.
Rated speed is fixed at 0.5 m/s, so width is the lever that changes capacity. Match your peak-hour pedestrian flow to the published carrying capacity figures rather than average daily footfall.
| Sizing question | 800 mm step width | 1000 mm step width |
|---|---|---|
| Published carrying capacity | Up to 4800 persons/hour | Up to 6000 persons/hour |
| Best fit | Moderate, steady pedestrian streams with occasional peaks | Heavy continuous streams and mixed traffic including carts and trolleys |
| Passing room | Single continuous flow; overtaking is limited | Wider lane allows faster users and wheeled traffic to coexist |
| Buyer decision | Choose when the modelled peak hour sits comfortably below 4800 persons/hour | Choose when peak hour approaches or exceeds 4800 persons/hour |
Concourse surge at train arrival, airport gate release and exhibition hall opening are the numbers that determine width.
The unit is published as accommodating wheelchairs, strollers, shopping carts, luggage carts and baby carriages — that traffic occupies extra lane width.
If the flow still exceeds 6000 persons/hour, plan parallel units rather than a non-standard width.
Moving walks are usually specified for the part of a journey that would otherwise be a long walk, not for a level change. The published envelope lets you plan a horizontal run, a shallow inclined run, or a sequence of both.

Each unit is published with a maximum travel length of 100 m and a maximum rising height of 8 m. Longer terminal concourses, station transfers and building-to-building links are therefore split into a chain of units, each within that envelope.
A 0° unit keeps the whole connection on one level. Where the route must also gain height, the 10°, 11° and 12° settings carry the same 800/1000 mm widths and the same 0.5 m/s rated speed, so the passenger experience stays consistent along the run.
When the connection must climb more than the moving walk's published rising envelope in one lift, the vertical segment belongs to an escalator or lift. Specify the handover point — landing, hall or mezzanine — so both routes meet cleanly.
Map the full passenger journey on one drawing and mark where distance is being covered and where height is being gained. That single drawing is the clearest brief you can send a supplier.
The product page states compliance with international safety standards, and for railway station applications with both Chinese and European safety standards. Build the documentation request into your tender rather than chasing it after award.
Name the market and the standard framework the project must satisfy, especially for rail and transit schemes where the dual-standard note applies.
Request the safety and quality documentation that supports the compliance claim alongside the technical offer.
Agree what is supplied: unit, pallets, balustrading, lighting, controls and installation support.
Outdoor or semi-outdoor installation, 24-hour duty and the services supplies should all appear in writing.
The moving walk page carries two different rise figures. Understanding why — and which to use — protects your submittal.
| Source on the product page | Stated figure |
|---|---|
| Narrative description | Lifting height 1.0–12.0 m |
| Specification table | Max. rising height 8 m |
| Width/angle table | Max. travel length 100 m, max. rising height 8 m |
Treat 8 m as the maximum rising height for a single unit until the supplier confirms otherwise in writing for your specific project. If your design rise is above 8 m, either split the rise across units or move that segment to a different vertical-transport solution. Put the confirmed figure into the purchase specification, not into a marketing summary.

Use the table below to translate a site scenario into a starting configuration, then confirm it with the supplier before it enters the tender.
| Site scenario | Starting configuration | Buyer decision to record |
|---|---|---|
| Airport terminal concourse transfer between piers | 1000 mm, 0° horizontal, 0.5 m/s, up to 6000 persons/hour | Luggage-cart traffic share and the split into 100 m segments |
| Railway station platform-to-hall transfer | 1000 mm, 0° or gentle incline, dual-standard compliance evidence requested | Which standard set applies and what certificate pack is required |
| Retail mall long frontage link between wings | 800 mm, 0° horizontal, sized against the mall's peak trading hour | Whether 4800 persons/hour covers the peak or a wider unit is needed |
| Exhibition or convention centre hall connector | 1000 mm, 0°, sized for opening-hour surge | Parallel units for event-day peaks instead of over-widening |
| Distribution centre or logistics mezzanine link | 800 mm, 0° or 10° incline, 24-hour duty | Trolley and cart clearance plus maintenance access |
| Outdoor or semi-outdoor station link | 800 / 1000 mm, outdoor installation specified | Weather detailing, drainage and finishes confirmed at enquiry stage |
| Connection that must also gain more than 8 m of rise | Split the route: moving walk within the published envelope, vertical segment on an escalator or lift | Handover landing location and interface responsibilities |
A horizontal transport system built around high-demand public spaces, with pedrail construction, modular assembly and continuous 24-hour duty.

The unit is described as using robust, durable pedrail construction that maintains structural integrity under continuous high-load scenarios — the working condition of transit concourses and retail frontages.
Continuous 24-hour operation is a published design point, intended to minimise downtime and maintain pedestrian flow through the day without scheduled shutdowns.
Wheelchairs, strollers, shopping carts, luggage carts and baby carriages are all accommodated, which is why the route is often preferred over stairs for mixed public traffic.
The page presents the unit for infrastructure developers and facility managers, with stated applications spanning airport terminals, railway stations, department stores, distribution centres, entertainment venues, markets, docks, shopping malls and exhibition buildings.
Four steps take the decision above into a quotation. The product page carries the enquiry action; the contact page reaches the wider equipment team.
Fix the route: vertical, horizontal or a sequence of both.
Select the configuration: 800 or 1000 mm width, 0° to 12° inclination, required rise and travel.
Record the site inputs: installation environment, 380V/220V supplies, 3500 mm curvature radius and duty hours.
Submit the brief for a specification review, OEM/ODM discussion or bulk-order pricing.
Share installation environment, step width, inclination, required rise or travel length and peak-hour pedestrian flow. Customised and OEM/ODM configurations can be discussed in the same enquiry.
an escalator moves people between building levels on a vertical route, so the rise dominates the journey. a moving walk moves people across distance on one level, or on a shallow incline between 0° and 12°, with travel lengths up to 100 m. the route decision comes first; every width, angle and capacity choice follows from it.
the moving walk is published with step widths of 800 mm and 1000 mm, and inclination options of 0°, 10°, 11° and 12°. both widths share the same inclination and speed options.
rated speed is 0.5 m/s and carrying capacity is 4800 or 6000 persons per hour depending on the configuration selected. because the speed is fixed, width is the main lever for meeting a higher peak-hour flow.
yes. the unit is published as supporting continuous 24-hour operation, and installation places include indoor, semi-outdoor and outdoor. confirm your specific environment at enquiry stage so finishes and detailing can be agreed.
both figures appear on the product page. the specification tables list a maximum rising height of 8 m with a maximum travel length of 100 m, while the narrative text describes a lifting height range of 1.0–12.0 m. for procurement, treat 8 m as the maximum rising height for a single unit until the supplier confirms otherwise in writing for your project, and split the rise across units or use a different vertical solution above that figure.
use the enquiry action on the product page or the contact us page. include the installation environment, step width, inclination, required rise or travel length, the 380v/220v services available and the expected peak-hour pedestrian flow. bulk orders, oem/odm and project-specific configurations can be discussed in the same enquiry.